
Cedar Park Neuro Rehab Unit
Sustainable Acoustics, working with Design Engine Architects, are delighted to have developed the acoustic strategy on Phase 1 of the Neuro Rehab unit known as Cedar Park, in the village Enham Alamein, near Andover. The idea of this facility is to assist with the introduction of people back into community-style living.
Waterside Drive, Walton on Thames
Construction and operational noise control at the new XCel Sports Hub.
St Mary Magdalene School, Greenwich
Sustainable Acoustics was commissioned by the Royal Borough of Greenwich to provide acoustic design advice for the construction of St. Mary Magdalene Church of England School, the proposed new school at Millennium Way, on the Greenwich Peninsula within site of the O2 arena. This site is affected by noise from London City Airport and the busy Millennium Way.
Lighthouse, Poole
Sustainable Acoustics acted as the acoustic specialists for the refurbishment of the well-known Lighthouse, Poole’s centre for the arts. We worked alongside award-winning architect Design Engine, to assist in the £5.3 million refurbishment of the iconic building, Britain’s largest regional arts centre.
F1 Summer Party, London
Bringing F1 to London - enabling car demos and late night partying in the heart of the city for Eddie Jordan and his band.
Skyllings Play Area, Newbury
Peter was instructed on behalf of a Town Council in a difficult case concerning an application under section 82 Environmental Protection Act 1990. As is often the case with Section 82 cases, the applicant was a litigant in person. Peter produced his report swiftly and it dealt with all of the significant points regarding whether a statutory nuisance existed. His previous experience as a local authority officer and his general wealth of experience was a decisive factor in the subsequent litigation.